The challenge
Construction handovers bring together condition checks, photographic evidence, open actions and client sign-off. When those records are split across forms, folders and email, it becomes difficult to confirm what was accepted.
The handover team needs one record that remains clear before, during and after the site visit.
The approach
Build the handover checklist around the spaces, required evidence and approval points for the project. Inspectors follow the same sequence and annotate photos where additional context is needed.
Review keeps unresolved items visible before sign-off. The complete inspection can then be shared as a professional report without rebuilding the evidence in a separate document.
The result
The handover record stays connected to the evidence that supports it. Site teams, operations staff and clients can work from the same confirmed inspection instead of reconciling separate files.